Work Schedule

 

Work in the NE section consists of Grading milled roads, Cutting, Trimming & Chipping

 

Work in the NW section consists of Grading, Grading Milled roads and Pulling Ditches

 

Work in the SE section consists of Zipping a road and Grading

 

Work in the SW section consists of Ditch Work and Mowing

 

 

We received 2 DOC Squads for a total of 13 people

 

1 Squad will assist with patching pot holes in the SW section

 

1 Squad will assist with directing traffic in the SW section