Tentative Work Schedule

December 3, 2018

 

Work in the NE section consists of Mowing NE 160th & 21st Ave. with Side Arm Mower

 

Work in the NW section consists of adding milling and materials to NW 185th St.

 

Work in the SE section consists of Grading SE 125th Ter. and SE 129th, Patch driveways on SE 66th St., Mow off of SE CR 100A with the Side Arm, Mow SE CR 18A, 9th, 109th, CR 221 & 21st Ave. and Patch pot holes on SE 48th St.

 

Work in the SW section consists of Grading SW 92nd, 147th, 160th and 114th

 

 

We received 2 DOC Squads for a total of 13 people

 

1 Squad will be Patching driveways on SE 66th St.

 

1 Squad will be Patching Pot holes on SE 48th St.