Tentative Work Schedule

April 13, 2023

 

Work in the NE section consists of Grading NE 223rd, NE 219th St. and NE 20th Ave. and Mowing sidewalks on NE CR 225 with the Zero Turns

 

Work in the NW section consists of Mowing sidewalks on NW CR 229 with the Zero Turns

 

Work in the SE section consists of Mowing SE CR 18 

 

Work in the SW section consists of Mowing SW CR 18, SW 80th Pl. and Mowing sidewalks on SW CR 18 with the Zero Turns