Work Schedule

 

 

Work in the NW section consists of Grading, Milling a road, Chipping limbs, Patching pot holes & Mowing

 

Work in the SW section consists of Grading and Pulling ditches

 

 

We received 3 DOC Squads for a total of 15 people

 

1 Squad will assist with trimming in the NW

 

1 Squad will pick up trash in the SW

 

1 Squad will assist with traffic control in the NW and Pick up trash in the NW

 

1 Squad from The Transition House (3 people) will be patching pot holes in the NW