Work Schedule

Work in the NE section consists of Mowing

 

Work in the NW section consists of Grading, Cutting, Trimming, Chipping and patching driveways and pot holes

 

Work in the SE section consists od Grading

 

Work in the SW section consists of Milling a road

 

 

No DOC Squads received today

 

 

1 Squad from The Transition House (2 people) will assist in patching driveways and pot holes