Tentative Work Schedule

October 16, 2019

 

Work in the NE section consists of Grading NE 227th St., NE 6th Ave. and NE 247th St. and Building a Head wall on NE 19th Ave.

 

Work in the NW section consists of Grading NW 178th Loop, NW 74th Ave., NW 38th Ave, Mowing NW CR 225 & NW CR 229 and Dig & Clean out a ditch on NW CR 225

 

Work in the SW section consists of Grading SW 209th St., SW 147th St. & SW 120th St., Mowing SW CR 100A and Building a pad at the Sampson City Fire Dept. on SW CR 227

 

 

 

We received 3 DOC Squads for a total of 16 people

 

1 Squad will be Picking up trash and weed eating all of SE 21st Ave.

 

1 Squad will be assisting in Building a head wall on NE 19th Ave

 

1 Squad will be directing traffic and assisting with Building a head wall on NE 19th Ave.