Tentative Work Schedule

June 3, 2019

 

Work in the NE section consists of Grading NE 171st and NE 5th

 

Work in the NW section consists of Digging a ditch on NW CR 225 and Patching pot holes on NW CR 235

 

Work in the SE section consists of Patching pot holes on SE 26th Ave. and Mowing SE 109th, SE 21st, SE 144th (Vystar Road), SE CR 100A and SE CR 230A

 

Work in the SW section consists of Grading SW 101st, SW 104th, SW 92nd, SW 106th and SW 120th, Cleaning up and dressing up Box Culvert on SW CR 231 (Dedan's Loop) and Mowing SW CR 231 (Dedan's Loop) and SW 104th

 

 

We received 2 DOC Squads for a total of 8 people

 

1 Squad will be directing traffic for cleaning up and dressing up the box culvert on SW CR 231 (Dedan's Loop)

 

1 Squad will be cleaning out a ditch on NE 14th Ave. then Picking up trash on SE 144th (off Griffis Loop) to SE 150th St.