Tentative Work Schedule

October 8, 2018

 

Work in the NE section consists of Removing tree stump out of ditch on NE 14th Ave. and Installing a culvert on NE 21st Pl

 

Work in the NW section consists of Pulling ditches off of NW 216th St., Mowing NW CR 225 and Installing a culvert on NW 45th St.

 

Work in the SE section consists of Grading the back side of SE 46th Loop, SE 8th, SE 51st, SE 52nd, roads off of SE CR 21B and 31st, Patching pot holes on SE 66th St., Trimming over head limbs on SE 15th Ave. and Installing a culvert on SE 3rd

 

Work in the SW section consists of Grading SW 114th, 181st, 120th and roads of SW CR 18 and Mowing SW 75th Ave.

 

 

We received 3 DOC Squads for a total of 13 people

 

1 Squad will be Patching pot holes on SE 66th St.

 

1 Squad will be Trimming over head limbs on SE 15th Ave.

 

1 Squad will be directing traffic on NE 14th Ave. and then for installing culverts