Work Schedule

 

Work in the NE section consists of Grading and Mowing

 

Work in the NW section consists of Grading, Digging ditches, Pulling ditches and Patching driveways

 

Work in the SE section consists of Zipping a road

 

Work in the SW section consists of Grading

 

 

We received 3 DOC Squads for a total of 17 people

 

1 Squad will be weed eating and picking up trash in the NE section

 

1 Squad will be weed eating and picking up trash in the SE section

 

1 Squad will be directing traffic for digging ditches in the NW section

 

 

1 Squad from The Transition House (3 people) will be assisting with patching driveways