Tentative Work Schedule

 

 July 19, 2018

 

Work in the NE section consists of Repairing 2 culverts on NE 154th

 

Work in the NW section consists of Grading and Repairing low areas on NW 41st Ave., Take up a culvert at 7797 NW CR 225, Pull ditches on NW 71st Ave. and Mow on NW CR 235

 

Work in the SE section consists of Scooping ditches in Lincoln City

 

Work in the SW section consists of Zipping SW 101st Ave.

 

 

We received 2 DOC Squads for a total of 12 people

 

1 Squad will be repairing 2 culverts on NE 154th

 

1 Squad will be picking up 4 mattresses on NW 215th Way and picking up trash and weed eating off of NE CR 200B