Tentative Work Schedule

September 18, 2018

 

Work in the NE section consists of Patching a driveway on NE CR 225

 

Work in the NW section consists of Grading NW 188th, 71st, Todd's Road and NW 212th

 

Work in the SE section consists of Grading Crystal Lake Homesite area and Cleaning out the ditch on SE 21st Ave. 

 

Work in the SW section consists of Trimming the outfall ditch on SW 69th

 

 

We received 3 DOC Squads for a total of 16 people

 

1 squad will be Patching a driveway on NE CR 225

 

1 Squad will be Trimming an outfall ditch on SW 69th

 

1 Squad will be assisting with traffic control on SE 21st Ave. cleaning out a ditch