Tentative Work Schedule

July 25, 2019

 

Work in the NE section consists of Grading NE 227th, NE 6th, NE 204th, NE 173rd & NE 12th and Clean out the outfall ditch on NE 227th

 

Work in the NW section consists of NW 211th and off NW CR 233

 

Work in the SE section consists of Patching a driveway at 564 SE 5th Ave

 

Work in the SW section consists of Grading SW 101st Ave and Mowing SW CR 231

 

 

We received # DOC Squads for a total of 16 people

 

1 Squad will be Weed eating all of SE 144th St.

 

1 Squad will be Picking up trash on SW CR 235 & SW CR 231

 

1 Squad will be assisting with Patching a driveway at 564 SE 5th Ave.