Work in the NE section consists of Grading NE 21st Lane and NE 19th Lane and Mowing NE 154th St. and NE 19th Ave.

 

Work in the NW section consists of Grading NW 178th Loop and Mowing the Shoulders on NW 41st Ave., NW 223rd St. and NW 38th

 

Work in the SE section consists of Grading SE 52nd St. and SE 11th Ave., Mowing SE 150th St., Mowing in Lincoln City with the Zero Turn and Hauling Dirt to the Keystone Airport and Pushing up Limerock at the Keystone Airport

 

Work in the SW section consists of Grading SW 106th Ave.