Tentative Work Schedule

October 29, 2019

 

Work in the NW section consists of Grading NW 62nd, NW 185th, Olin's Mobile Home Park, NW 71st Pl., NW 203rd and NW 205th,  Clean out ditches on NW CR 235 and Dig out the Outfall Ditch on NW CR 225

 

Work in the SE section consists of Grading SE 49th Ave. (North from SE 109th to Dead End), then work towards Crystal Lake Homesites and Mowing SE CR 18, SE CR 221 and SE CR 325

 

Work in the SW section consists of Mowing SW CR 231 & SW CR 237 with the Zero Turns and Patching Pot Holes on SW CR 227 (From Brooker School to 301) and  SW CR 225A and SW CR 18

 

 

We received 2 DOC Squads for a total of 6 people

 

1 Squad will be assisting with Patching Pot Holes on SW CR 227, SW CR 225A & SW CR 18

 

1 Squad will be directing traffic for Cleaning out Ditches on NW CR 235