Tentative Work Schedule

June 8, 2023

 

Work in the NE consists of Grading NE 227th St. and NE 6th Ave.

 

Work in the NW section consists of Grading NW 185th St., NW 84th St., NW 196th St. and NW 251st St.

 

Work in the SE section consists of Repairing a Guardrail on SE 163rd St., Mowing SE CR 18A, SE CR 21B and SE 8th Ave. and Working at the Keystone Airport

 

Work in the SW section consists of Mowing the Shoulders of the road on SW 106th Ave. and SW 105th Ave.