Tentative Work Schedule

April 24, 2019

 

Work in the NE section consists of Patching Pot Holes on NE 179th St.

 

Work in the NW section consists of Zipping and Grading NW 177th St. & NW 62nd Ave., Grading NW 25th Ave., NW 142nd Ter., NW 62nd, NW 251st, NW 261st. & NW 267th, Trim low limbs on NW 203rd St. and Mow NW CR 125

 

Work in the SE section consists of Cutting trees and Cleaning out ditch on SE 23rd Ave.

 

Work in the SW section consists of Spreading and Grading milling in SW 168th St.. Chipping debris on SW 132nd Ave. and Patching the shoulder of the road at the intersection of SW CR 18 at US Hwy 301

 

 

We received 3 DOC Squads for a total of 13 people

 

1 Squad will be Chipping debris on SW 132nd Ave.

 

1 Squad will be Picking up trash and weed eating on NW CR 125

 

1 Squad will be Patching the shoulder of the road at the intersection of SW CR 18 & US Hwy. 301, Cutting trees down on SE 23rd Ave. and Patching pot holes on NE 179th St