Work Schedule

Work in the NE section consists of Mowing ROW

 

Work in the NW section consists of Pulling ditches & Milling a road and Grading

 

Work in the SE section consists of Chipping limbs

 

Work in the SW section consists of Pulling ditches and Lime rock a road

 

 

We received 2 DOC Squads with a total of 9 people

 

1 Squad will be Chipping limbs in the SE

 

1 Squad will be handling traffic control for installation of culverts

 

 

1 Squad from The Transition House (2 people) will be patching pot holes and driveways in the SE, NE and NW