Tentative Work Schedule

July 6, 2023

 

Work in the NE section consists of Grading NE 173rd St. and NE 21st Lane and Mowing NE CR 225, NE CR 200B, NE 216th St. and NE 14th Ave.

 

Work in the NW section consists of Cleaning out the Ditches on NW 203rd St.

 

Work in the SE section consists of Grading SE 43rd, SE 46th and SE 86th and Mowing the Shoulders of the Road on SE 86th St., SE 49th Ave. and SE 46th Ave.

 

Work in the SW section consists of Grading SW 136th St., SW 155th Ave. and SW 144th and Mowing Brooker School with the Zero Turn