Tentative Work Schedule

November 5, 2018

 

Work in the NE section consists of Picking up tires on NE 12th Ave., Trimming limbs on NE 7th

 

Work in the NW section consists of Limerocking NW 228th, NW 75th Ave., Install culverts on NW CR 229 & NW 55th Ave. and Dig the ditch on NW 216th 

 

Work in the SE section consists of Patching driveways and Pot Holes on SE 66th St. and Mowing SE 46th Loop with the Side Arm

 

Work in the SW section consists of Zipping SW 101st Ave.

 

 

We received 3 DOC Squads for a total of 18 people

 

1 Squad will be Patching Pot Holes & Driveways on SE 66th St.

 

1 Squad will be Trimming limbs on NE 7th

 

1 Squad will be directing traffic for installing culverts on NW CR 229 & NW 55th Ave.