Work Schedule

 

Work in the NE section consists of Grading

 

Work in the NW section consists of Grading, Working the top of NW 203rd St., Patching Pot Holes, Mowing the shoulders of the road and Grading milled roads

 

Work in the SE section consists of Grading, Scooping the ditch on SE 153rd St. and Grading milled roads

 

Work in the SW section consists of Grading, Patching Pot Holes, Mowing and Grading milled roads

 

 

We received 3 DOC Squads for a total of 18 people

 

1 squad to weed eat roads off of NE CR 225 in Lawtey

 

1 squad to weed eat ditch in Conerly Estates (NW 182nd Way)

 

1 squad to work traffic control on NE 153rd St.

 

 

1 squad from the Transition House to patch driveway at 129 SE 46th Loop  (5 people)