Work Schedule

 

 

Work in the NW section consists of Scooping ditches, Patching driveways and Cutting, Trimming and Chipping

 

Work in the SE section consists of Zipping a road and Grading

 

Work in the SW section consists of Fixing washouts, Picking up & Hauling off limerock and asphalt that washed off road and patching Driveways  

 

 

We received 3 DOC Squads for a total of 16 people

 

1 Squad will be assisting with Cutting, Trimming and Chipping in NW section

 

1 Squad from The Transition House (3) to assist with Patching driveways