Work Schedule

 

Work in the NW section consists of Grading, Pulling ditches and Patching driveways

 

Work in the SE section consists of Grading, Mowing and Cutting, Trimming and Chipping

 

Work in the SW section consists of Zipping a road, Digging ditches and Installing a culvert

 

 

We received 2 DOC Squads for a total of 11 people

 

1 Squad will be assisting with Cutting, Trimming & Chipping in the SE section

 

! Squad will be directing traffic for installing a culvert & digging ditches in the SW section

 

 

1 Squad from The Transition House (3 people) will be assisting in patching driveways in the NW section