Tentative Work Schedule

March 29, 2023

 

Work in the NE section consists of Cleaning out a ditch on NE 19th Ave. and Grading NE 20th Lane

 

Work in the NW section consists of Grading NW 178th Loop and  NW 36th Ave. 

 

Work in the SE section consists of Grading SE 26th Ave., SE 147th and SE 25th

 

Work in the SW section consists of Grading SW 64th Ave., SW 65th Ave. and SW 162nd. St. and Mowing SW 161st, SW CR 231 and SW CR 235

 

We will also be Patching Pot Holes all over the County