Tentative Work Schedule

October 30, 2018

 

Work in the NW section consists of Pulling ditches and limerocking NW 228th, Limerocking NW 75th Ave., Scooping the ditches on NW 84th Ave., Digging the ditch on NW 53rd Ave., Mowing NW 182nd & NW 61st with the Side Arm and Patching a driveway on NW 64th Ave.

 

Work in the SE section consists of Trimming limbs on SE 16th Way and 16th St. and Scoop ditch at SE CR 18 and SE 43rd

 

Work in the SW section consists of Zipping, adding Clay & Enzymes and mixing SW 101st Ave.

 

 

We received 3 DOC Squads for a total of 16 people

 

1 Squad will be Patching a driveway on NW 64th Lane

 

1 Squad will be Trimming limbs on SE 16th Way and SE 16th St.

 

1 Squad will be Scooping the ditch at SE CR 18 & SE 43rd and Scooping ditches on NW 84th Ave.