Tentative Work Schedule

April 15, 2019

 

Work in the NW section consists of Zipping NW 219th St., Grading NW 219th Ter., NW 70th, NW 44th and NW 41st. and Clean up NW 53rd Ave. Ditch

 

Work in the SE section consists of Cleaning out the ditch on SE 23rd Ave.

 

Work in the SW section consists of Grading SW 92nd and SW 104th and Patching (filling in) a driveway on SW CR 231 (Dedan Loop)

 

 

We received 2 DOC Squads for a total of 10 people

 

1 Squad will be Laying SOD on NW 53rd Ave. ditch

 

1 Squad will be Cleaning up around SHOP