Tentative Work Schedule

October 4, 2021

 

Work in the NE section consists of Mowing ROW and Outfall ditch on NE 219th St. and Finishing and Cleaning up on NE 17th Ave.

 

Work in the NW section consists of Grading NW 35th Ave. and NW 209th, Cleaning out ditches on NW CR 233 and Patching Pot Holes on NW 219th St. off NW CR 225

 

Work in the SE section Consists of Grading SE 50th and SE 31st and Mowing SE 9th Ave. and SE CR 18A

 

Work in the SW section consists of Grading SW 101st Ave.

 

 

1 DOC Squad has 3 Inmates and will be assisting with finishing up and Cleaning up on NE 17th Ave.