Tentative Work Schedule

November 18, 2019

Work in the NW section consists of Grading NW 219th St. and Mowing NW 71st Ave. (all 3 sections), NW 49th, NW CR 229 & NW CR 235

 

Work in the SE section consists of Re-Grading SE 49th then SE 11th Ave., Patching Pot Holes on SE 11th Ave. and Mowing SE CR 18 with Zero Turn

 

Work in the SW section consists of Grading SW 66th & SW 101st Ave., Cleaning out ditch pavers on SW CR 18 at River Bend, Scoop out the Outfall culverts on SW CR 237, Mowing SW CR 235 and Zero Turn on SW CW 18

 

 

We received 3 DOC Squads for a total of 14 people

 

1 Squad will be Cutting off the end of a culvert and then Picking up trash and Weed Eating on SW CR 237

 

1 Squad will be Picking up trash and Weed eating on NW CR 235

 

1 Squad will be directing traffic for Cleaning out the Concrete ditch pavers on SW CR 18