Work Schedule

 

Work in the NE section consists of Mowing and patching driveways

 

Work in the NW section consists of Grading, Mowing and Digging ditches

 

Work in the SE consists of Zipping & Packing a road, Patching driveways and Repairing a bridge

 

Work in the SW section consists of Repairing/Rebuilding a road

 

 

We received 3 DOC Squads for a total of 19 people

 

1 Squad will be assisting in repairing a bridge in SE section

 

1 Squad will be picking up trash in the NW section

 

1 Squad will be assisting in directing traffic in the NW section

 

 

1 Squad from The Transition House (4 people) will be assisting in patching driveways