Tentative Work Schedule

Work in the NE section consists of Mowing

 

Work in the NW section consists of Removing a block at 4783 NW CR 125, Installing a culvert at 3770 NW CR 125, Limerocking NW 267th St., Patching pot holes on NW 185th St. & NW 62nd, Digging out a ditch on NW CR 125 off NW CR 225A and Mowing with the Side Arm Mower on NW 196th St

 

Work in the SE section consists of Milling SE 66th St.

 

Work Work in the SW section consists of Installing a Culvert on SW 80th Pl. and Patching pot holes on SW CR 235

 

 

We received 3 DOC Squads for a total of 17 people

 

1 squad will be patching pot holes on NW 185th, NW 62nd and SW CR 235

 

1 Squad will be picking up trash and weed eating NW CR 233

 

1 Squad will be conducting traffic control for removing a block on NW CR 125 and installing culverts on NW CR 125 and SW 80th Pl