Work Schedule

 

Work in the NW section consists of Grading, Ditch work and Cut, Trimming and Chipping

 

Work in the SE section consists of Zipping a road, Grading and Patching pot holes and driveways

 

Work in the SW section consists of Mowing and patching pot holes and driveways

 

 

We received 3 DOC Squads for a total of 17 people

 

1 Squad will assist with Cutting, Trimming and Chipping in the NW

 

1 Squad will be picking up trash, weed eat and mow around mailboxes, culverts and guardrails in the SW

 

1 Squad will assist with directing traffic for ditch work in the NW

 

 

 

1 Squad from The Transition House (3 people) will assist with patching pot holes and driveways in the SE & SW