Tentative Work Schedule

August 9, 2018

 

Work in the NE section consists of Mowing with the Side Arm Mower NE 173rd, 20th Ln., 19th Ln., 12th, 171st,18th

 

Work in the NW section consists of Pulling ditches on SE 38th  Ave. off Meng Dairy Road, Installing a culvert on NW 264th and Digging Ditches on NW 55th Lane

 

Work in the SE section consists of Installing culverts on SE 9th Ave. & SE 44th, Pulling ditches on SE 38th Ave. off Meng Dairy Road, Repair driveways on SE 66th St and Mow off of SE CR 18

 

Work in the SW section consists of Limerocking SW 132nd Ave., Repair and Pull ditches on SW 155th Ave. and Mow SW CR 225 and SW CR 18

 

 

We received 3 DOC Squads for a total of 16 people

 

1 Squad will be repairing driveways on SE 66th St.

 

1 Squad will be picking up trash on SW CR !* and SW CR 225 from SW 101st to SW CR 227

 

1 Squad will be weed eating around the Stop Sign at the intersection of US Hwy. 301 and NW 247th St., weed eating at the Market Road pit and Picking up trash on Market Road and