Tentative Work Schedule

February 11, 2019

 

Work in the NE section consists of Grading NE 20th and Patching pot holes on NE 19th Ave. & NE 14th Ave

 

Work in the NW section consists of Grading NW 178th Loop & NW 205th and Patching pot holes on NW 59th Loop and at 17878 NW 59th Loop

 

Work in the SE section consists of Adding Milling & limerock to SE 46th Loop & SE 49th and Grading them out, Replacing signs on SE CR 18A and Installing Speed Humps on SE 2nd Ave. in the Keystone Golf & Country Club

 

Work in the SW section consists of Grading AW 114th & SW 155th and Getting water off SW 104th Ave. and SW CR 18 in Graham

 

 

We received 3 DOC Squads for a total of 16 people

 

1 Squad will be  Patching pot holes on NW 59th Loop and on NE 14th Ave.

 

1 Squad will be assisting with installing Speed Humps on SE 2nd Ave. in the Keystone Golf & Country Club

 

1 Squad will be directing traffic on SW 104th Ave. & at SW CR 18 in Graham