Tentative Work Schedule

June 26, 2023

 

Work in the NE consists of Mowing NE 17th Ave. and NE 14th Ave. with the Zero Turn

 

Work in the NW section consists of Grading NW 185th St., NW 84th Ave., NW 188th St. and NW 2657th St.

 

Work in the SE section consists of Hauling Dirt out of the New Airport Road (SE 81st St.) and taking it to the Market Road pit

 

Work in the SW section consists of Grading SW 101st Ave. and SW 163rd St.