Work Schedule

 

Work in the NE section consists of Grading and Grading milled roads

 

Work in the NW section consists of Grading, Grading milled roads and Blowing out culverts 

 

Work in the SE section consists of Adding limerock to a road, Mowing with the Side Arm Mower, Chipping a tree and Patching Pot Holes

 

Work in the SW section consists of Installing Culverts and Mowing

 

 

We received 3 DOC Squads for a total of 17 people

 

1 Squad will be Picking up trash and weed eating in NE

 

1 Squad will be Chipping a tree and Patching pot holes in the SE

 

1 Squad will be assisting with Blowing out Culverts in the NW