Tentative Work Schedule

January 26, 2022

 

Work in the NE section consists of Lowering a culvert on NE 6th Ave. and Cleaning out a ditch on NE 19th Lane

 

Work in the NW section consists of Grading NW 70th and Patching Driveways on NW CR 235, NW CR 225

 

Work in the SE section consists of Grading SE 38th Ave., SE 49th Ave. and SE 72nd

 

Work in the SW section consists of Grading SW 101st Ave.

 

 

We received 1 DOC (BCSO-JAIL) Officer and 4 Inmates and will Picking up Trash on SW CR 225