Tentative Work Schedule

March 14, 2019

 

Work in the  NE section consists of Reinforcing ditch with concrete on NE 160th

 

Work in the NW section consists of Digging the ditch on NW 53rd Ave. (Cooksey ditch)

 

Work in the SE section consists of Chipping limbs and debris on SE 46th Loop

 

Work in the SW section consists of Grading SW 106th Ave. & SW 142nd (Brooker pit road), Grading & Packing SW 92nd and Patching pot holes on SW CR 235

 

 

We received 1 DOC Squad for a total of 6 people

 

1 Squad will be Chipping limbs and debris on SE 46th Loop