Tentative Work Schedule

November 18, 2020

 

Work in the NE section consists of Mowing with the Zero Turns and Weed Eating NE 216th St. and NE CR 200B

 

Work in the NW section consists of Grading NW 203rd St. and NW 178th Loop, Patching Pot Holes on NW 55th St. and NW 59th Ave., Mowing around Bridges and Crossovers on NW 216th St. and NW CR 200A, Mowing NW CR 125, NW CR 225A and NW CR 225, Picking up limbs on NW CR 229, NW CR 225 and NW CR 235

 

Work in the SE section consists of Grading SE 71st St, SE 72nd St and SE 73rd St, Prepping SE 1st Ave. for Fog Sealing, Patching Pot Holes on SE 136th Loop and Mowing ROW on SE 86th St.

 

 

We received 2 DOC Squads for a total of 8 people

 

1 Squad will be Picking up trash and wed eating on NW CR 229 and NW CR 225

 

1 Squad will be Assisting with Patching Pot Holes on NW 55th St. and NW 59th Ave.