Tentative Work Schedule

October 7, 2019

 

Work in the NE section consists of Mowing NE 173rd St, NE 28th and NE 185th and Cleaning out and Mowing NE 19th Ave. outfall ditch

 

Work in the NW section consists of Grading NW 127th, NW 130th Pl & NW 132nd Ave., Re-build head wall on NW CR 235 and Mow (with 1/2 Batwing) NW 177th & NW 62nd and Market Road (301 to 16)

 

Work in the SE section consists of Grading SE 38th, SE 41st, SE 43rd, SE 45th & SE 103rd and Working on the Parking lot and Walking pad at Lincoln City Park

 

Work in the SW section consists of Grading SW 163rd

 

 

We received 3 DOC Squads for a total of 14 people

 

1 Squad will will be picking up trash and weed eating NE 19th Ave., NE 171st, NE 173rd & NE 28th Ave.

 

1 Squad will be assisting in re building a head wall on NW CR 235

 

1 Squad will be Cleaning out ditch pavings on NW CR 235