Tentative Work Schedule

October 25, 2018

 

Work in the NW section consists of Installing a Crossover pipe and Limerocking NW 75th Ave., Dig Ditches on NW 84th Ave. and  Dig NW 53rd Ave.

ditch

 

Work in the SE section consists of Trimming SE 8th Ave.

 

Work in the SW section consists of Adding Clay and Zipping SW 101st 

 

 

We received 3 DOC squads for a total of 18 people

 

1 Squad will be Weed Eating NW 185th

 

1 Squad will be Trimming Trees on SE 8th Ave.

 

1 Squad will be directing Traffic to Digging Ditches on NW 84th Ave.