Tentative Work Schedule

August 9, 2023

 

Work in the NE section consists of Mowing the Shoulders of the road on NE 223rd St., NE 227th St. and NE 6th Ave.

 

Work in the NW section consists of Grading NW 71st Ave., Open up Culverts  on NW CR 200A and Mark for No Cuts on NW 74th Ave.

 

Work in the SE section consists of Grading SE 94th St., SE 129th St. and SE 126th St.

 

Work in the SW section consists of Grading SW 66th Lane, SW 65th Ave. and SW 64th Ave., Mowing SW 161st St., SW CR 231 and SW 175th St. and Mowing SW 161st St. off SW CR 235 with the Zero Turns.