Tentative Work Schedule

September 21, 2021

 

Work in the NW section consists of Grading NW 41st and NW 44th, Cleaning out the ditch on NW 251st st. and Mowing ROW on NW 105th St.

 

Work in the SW section consists of  Grading SW 180th and SW 144th, Digging out the ditch on SW 92nd  St. and Hauling off the dirt and Mowing SW CR 231 and SW CR 18

 

 

We received 2 DOC (BCSO-JAIL) Officers and a total of 4 Inmates

 

1 Squad with 1 Inmate will be assisting with opening up a culvert at the Hampton Lake Boat Ramp

 

1 Squad with 3 Inmates will be Weed eating the Pratt St. Pond