Work Schedule

 

 

Work in the NE section consists of Grading milled roads

 

Work in the NW section consists of Grading, Grading milled roads, Mowing and Cutting down trees

 

Work in the SE section consists of Grading, Installing culverts and Cleaning out a pond

 

Work in the SW section consists of Zipping a road and Installing culverts

 

 

We received 2 DOC Squads for a total of 13 people

 

Both Squads will be Cutting down and Trimming trees in the NW