Tentative Work Schedule

October 16, 2018

 

Work in the NE section consists of Grading NE 21st Lane and NE 20th Lane

 

Work in the NE section consists of Rocking the intersection of NW CR 225 & NW 75th Ave. and Pulling ditches on NW 75th Ave., Grading NW 178th Loop, Scooping the ditch at 6565 & 6573 NW CR 125, Mowing NW CR 225 and NW CR 229 and Patching pot holes on NW 224th St.

 

Work in the SE section consists of Patching pot holes at the Intersection of SE 50th St. & SE CR 21B

 

Work in the SW section consists of Scooping the ditch at the end of SW 65th Ave. and lining it with rock, Mowing SW 92nd, 106th Ave. and down SW CR 18 with the Side Arm Mower and Mowing SW 75th Ave.

 

 

Due to Hurricane Michael, we only received 1 DOC Squad with 4 people and they will be handling traffic control for Scooping NW CR 125 ditch and Scooping the ditch at the end of SW 65th Ave. and lining it with rock